Shenzhen Grande Electronic Linkedin Page
Shenzhen Grande Electronic Co., Ltd logo
E-mail us for a Quote:
sales88@greattong.com
Call us now:
+86-755-83261869

The Safety Requirements Between PCBA & Enclosure

2020-09-23

It is well know that PCBA Enclosure Design should follow all safety requirements. In other words, as long as the PCBA Enclosure Design meets the safety requirements, then the quality of product won’t be affected. Now, as a Shenzhen PCBA manufacturer, Gran

READ MORE

Grain Making Machine Control Board & Transfer Board | PCBA | Grande Electron

2020-09-23

Supplier: Grande Electronics Layers: 4 Application: Grain Making Machine Control Board & Transfer Board | PCBA | Grande Electronics PCB:FR-4/1.6mm,1oz finished copper Surface Treatment: HASL PCBA Lead time: 3-4 weeks Packing: Anti-static b

READ MORE

Pet Food Processing Machine Turnkey PCBA Contract Manufacturing Service

2020-09-23

Supplier: Grande Electronics Layers: 6 Application: Pet Food Processing Machine Turnkey PCBA Contract Manufacturing Service PCB:FR-4/1.6mm,1oz finished copper Surface Treatment: HASL PCBA Lead time: 3-4 weeks Packing: Anti-static bag and compa

READ MORE

Nitrogen Gas Generator 4 Layer Blue Solder Mask Printed Circuit Board Assembly

2020-09-23

Supplier: Grande Electronics Layers: 4 Application: Nitrogen Gas Generator 4 Layer Blue Solder Mask Printed Circuit Board Assembly PCB:FR-4/1.6mm,1oz finished copper Surface Treatment: HASL PCBA Lead time: 3-4 weeks Packing: Anti-static bag an

READ MORE

Oxygen Concentrator Generator Customized PCBA | One- Stop PCB Assembly

2020-09-23

Supplier: Grande Electronics Layers: 6 Application: Oxygen Concentrator Generator Customized PCBA | One- Stop PCB Assembly PCB:FR-4/1.6mm,1oz finished copper Surface Treatment: ENIG PCBA Lead time: 3-4 weeks Packing: Anti-static bag and compa

READ MORE

Network Computing Controller Board Assembly PCBA Electronics Manufacturing

2020-09-23

Supplier: Grande Electronics Layers: 10 Application: Network Computing Controller Board Assembly PCBA Electronics Manufacturing PCB: Hg 180 / 1.6mm, 3oz finished copper Surface Treatment: ENIG PCBA Lead time: 3-4 weeks Packing: Anti-static bag

READ MORE

How Should We Choose Substrate For PCBA Correctly?

2020-09-22

As you probably know, the life cycle and performance of circuit board assembly (PCBA) depends on the substrate of PCB board. Therefore, in order to choose the correct substrate, it is quite necessary to understand the materials used for different circuit

READ MORE

Wet Tower Dispenser 6 Layer Circuit Board | Turnkey PCB & PCBA Service

2020-09-22

Supplier: Grande Electronics Layers: 6 Application: Wet Tower Dispenser 6 Layer Circuit Board | Turnkey PCB & PCBA Service PCB:FR-4/1.6mm,1oz finished copper Surface Treatment: ENIG PCBA Lead time: 3-4 weeks Packing: Anti-static bag and c

READ MORE

Energy Saving Equipment Control Board | PCBA Prototyping & Manufacturing

2020-09-22

Supplier: Grande Electronics Layers: 6 Application: Energy Saving Equipment Control Board | PCBA Prototyping & Manufacturing PCB:FR-4/1.6mm,1oz finished copper Surface Treatment: HASL PCBA Lead time: 3-4 weeks Packing: Anti-static bag and

READ MORE

Spray Foam Machine Printed Circuit Board Assembly | PCBA Prototyping

2020-09-22

Supplier: Grande Electronics Layers: 10 Application: Spray Foam Machine Printed Circuit Board Assembly | PCBA Prototyping PCB:FR-4/1.6mm,1oz finished copper Surface Treatment: ENIG PCBA Lead time: 3-4 weeks Packing: Anti-static bag and compar

READ MORE
Home About Us Services Quality Pb-Free News Contact Us


Copyright ® 2017,Shenzhen Grande Electronic Co., Ltd. All Rights Reserved. English 中文站 Sitemap