Shenzhen Grande Electronic Linkedin Page
Shenzhen Grande Electronic Co., Ltd logo
E-mail us for a Quote:
sales88@greattong.com
Call us now:
+86-755-83261869

Home > Products


Energy- Saving SMT PCB Assembly-Grande EMS

Time:2020-07-28 11:12:49 Click:

 

Supplier: Shenzhen Grande Electronics
Layers:6
Application:Energy Saving SMT PCB Assembly-Grande EMS
PCB:FR4/1.6mm/1oz
Min Via: 0.2mm
Surface Treatment: ENIG
PCBA Lead time: 3-4 weeks
Testing: 100% E-test
Standard Warp:<0.75%

Description

1, Turnkey solution for Energy Saving SMT PCB Assembly-Grande EMS
2, PCB Assembly, PCB fabrication / PCB layout, PCB Reversing.
3, Full Bespoke PCBA/ OEM/ EMS(Electronics Manufacturing Services).
4, SMT&DIP&PTH&BGA.
5, Components Sourcing.
6, Quick PCBA prototype.
7, X-ray test, ICT and Functional Circuit Test.
8, Sample and small batch order are accepted.

PCBA Service
Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.
Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.

PCBA Quality Assurance
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008 
2, 7 lines dust-proof SMT lines and DIP lines.
3, All line works wear anti-static and dust-proof clothing.
4, All operators should pass strictly training before they start work.
5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering, Semi-auto DIP
6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.
7, PCBA Test:ICT, Functional Circuit Test and X-ray test.
8, Package Processed:
0402, 0603, 0805, 1206, 1608, 2125, 3216
Micro QFP 0.2mm
Flip-chip, BGA, Connectors
BGA Ball Pitch=0.2mm
9, Each workstation in accordance with the SOP 
10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.
11, Material Brand:KB, SHENGYI, NANYA and so on. 

PCBA Lead Time
PCBA prototype: 7-10 working days after contract signed and EQ confirmed. 
Mass production: partial delivery according to the customer’s requirement.

Other information for PCBA
1, The mass production will be arranged after PCBA prototype confirmed. 
2, Use Teflon adhesive tape to protect Mount Holes and GND Holes.
3, EPE is used to avoid impact and crash.
PCBA Standard Packing
Anti-static bag and compartmental packing


Previous:EDM Machine Quick-Turn PCB Assembly-HASL 58pcba

Next:Access Control System 4 Layers PCB Assembly-PCBA Supplier China

 
Home About Us Services Quality Pb-Free News Contact Us


Copyright ® 2017,Shenzhen Grande Electronic Co., Ltd. All Rights Reserved. English 中文站 Sitemap