Shenzhen Grande Electronic Linkedin Page
Shenzhen Grande Electronic Co., Ltd logo
E-mail us for a Quote:
sales88@greattong.com
Call us now:
+86-755-83261869

Home > Products


Industrial Supply Power One-Stop Prototype Assembled PCB Manufacturer

Time:2018-05-24 11:09:41 Click:

Industrial Supply Power PCBA


 

 

 

 

 

 

 

 

 

 

 

Supplier: Shenzhen Grande Electronic
Layers: 4
Application:Industrial Supply Power One-Stop Prototype Assembled PCB Manufacturer

PCB:FR-4/1.6mm, 2oz finished copper
Surface Treatment: HASL
PCBA Lead time: 3-4 weeks
Packing: Anti-static bag and compartmental packing
Standard Warp: 0.75% 


 

【Description】
1.Industrial Supply Power One-Stop Prototype Assembled PCB Manufacturer.
2.PCB Assembly, PCB fabrication / PCB layout, PCB re-layout.
3.Electronic Contract Manufacturing.
4.SMT&DIP&PTH&BGA.
5.Components Sourcing.
6.Quick PCBA prototype.
7.X-ray test, the Internal Circuit Test (ICT) , Functional Test (FCT)
8.Sample and small batch order are accepted.


PCBA Service
Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.
Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.

PCBA Quality Assurance
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008 
2, 7 lines dust-proof SMT lines and DIP lines.
3, All line works wear anti-static and dust-proof clothing.
4, All operators should pass strictly training before they start work.
5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering, Semi-auto DIP
6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.
7, PCBA Test:ICT, Functional Circuit Test and X-ray test.
8, Package Processed:
0402, 0603, 0805, 1206, 1608, 2125, 3216
Micro QFP 0.2mm
Flip-chip, BGA, Connectors
BGA Ball Pitch=0.2mm
9, Each workstation in accordance with the SOP 
10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.
11, Material Brand:KB, SHENGYI, NANYA and so on. 

PCBA Lead Time
PCBA prototype: 7-10 working days after contract signed and EQ confirmed. 
Mass production: partial delivery according to the customer’s requirement.

Other information for PCBA
1, The mass production will be arranged after PCBA prototype confirmed. 
2, Use Teflon adhesive tape to protect Mount Holes and GND Holes.
3, EPE is used to avoid impact and crash.
PCBA Standard Packing
Anti-static bag and compartmental packing


Previous:Door Sensor PCB Prototype and Assembly EMS Company

Next:Spinner 4-Layer Main Board PCB Manufacturing and Assembly-China Manufacturing

 
Home About Us Services Quality Pb-Free News Contact Us


Copyright ® 2017,Shenzhen Grande Electronic Co., Ltd. All Rights Reserved. English 中文站 Sitemap